MAJA Sentinel-2 L2A processor downloaded more than 200 times

Since spring 2017, we have made the MAJA cloud screening and atmospheric correction processor available for commercial use. A bit later, end of June, the Sen2agri software package, which includes MAJA older version (named MACCS) , was also released to the public. We did not expect a large success, as these two packages are quite heavy ones, do not work on laptops, and require a specific linux system powerful computers (Red Hat or CentOS).Anyway, the MAJA processor has had quite a large success, even if, I guess, it is far from the success of Sen2cor, which is much easier to install and use, even if the performances are not the same. The figures below correspond nearly to one download per day. 

Number of downloads of MAJA (stand alone version)93
Number of downloads of MACCS (Sen2Agri version)i116

 To celebrate this fact, we just published a brand new MAJA detailed description.

Plus d'actualités

BIOMASS, the third launched satellite mission designed at CESBIO !

After SMOS in 2009, and VENµS in 2017, the CESBIO Laboratory is very proud to see its third proposed mission, Biomass, reach orbit. As always, it has been a long journey from the idea, at the beginning of the century, to the selection in 2013 as the seventh Earth Explorer Mission by ESA, to the […]

Biophysical parameter retrieval from Sentinel-2 images using physics-driven deep learning for PROSAIL inversion

The results presented here are based on published work: Y. Zérah, S. Valero, and J. Inglada. « Physics-constrained deep learning for biophysical parameter retrieval from sentinel-2 images: Inversion of the prosail model« , in Remote Sensing of Environment, doi: 10.1016/j.rse.2024.114309. This work is part of the PhD of Yoël Zérah, supervised by Jordi Inglada and Silvia Valero. […]

Copernicus should keep S2A operational after S2C launch

The launch of Sentinel-2C (S2C) is scheduled on the 4th of September 2024, next week ! After 3 months of commissioning phase, S2C will replace S2A, to fulfill the Sentinel-2 mission together with S2B. S2B will later be replaced by S2D. The current plans are to keep S2A as a redundant satellite, in case something […]

Rechercher