They did it / Ils l’ont fait

The blue line in the above plot shows the amount of L2A products delivered by our MUSCATE facility every day since end of November. Even if the start looked promising, we had several issues. MUSCATE bugs, PEPS bugs, and the large blanc period in January was related to the installation of the new cluster and migration of the disks, and the recovery of the surprises it brought. Many of the following drops happened when its disks were slow. Some of them are also due to MUSCATE’s own bugs, which often happen on week-ends when there is no-one to restart the production. But since end of March our cluster’s bay of disks is working very well, the number of bugs is really decreasing, and our exploitation team is more confident on the system capacities and launches more jobs in parallell. And finally, yesterday, we passed the green bar, which is our requirement in terms of number of L2A to produce per day in reprocessing conditions. It represents 8 times the acquisitions performed by Sentinel-2A over our zones in one day (which is the red dashed line).Congrats to all the teams  ! And now, beer ? wine ? champagne ?  La ligne bleue sur la courbe ci-dessus indique le nombre de produits Sentinel-2 de niveau 2A, fournis par notre segment sol MUSCATE depuis fin novembre. Même si le début était encourageant, nous avons eu beaucoup de problèmes : des bugs de MUSCATE, des bugs de PEPS, et la période blanche de janvier correspond à la mise en place du nouveau cluster, et la récupération des surprises qu’il a causées. Plusieurs des baisses de production sont aussi dues aux engorgements des baies de disques que nous avons eu au début, d’autres viennent encore de bugs résiduels, qui ont la manie d’apparaître le week-end, quand il n’y a personne pour relancer la production.Mais depuis fin mars, les baies de disques « torchent », les bugs disparaissent, et notre équipe d’exploitation fait davantage confiance au système pour lancer de grosses productions. Et c’est finalement hier que nous avons passé pour la première fois la barre verte, qui est notre spécification de production en conditions de retraitement. Elle représente aussi 8 fois la capacité d’acquisition de tuiles par Sentinel-2 sur nos zones d’intérêt (la ligne rouge pointillée). Un grand bravo et merci à tous. Et maintenant, bière, vin, champagne ? 

Plus d'actualités

Sentinel-2 reveals the surface deformation after the 2025 Myanmar earthquake

Sentinel-2 captured several clear-sky images of Myanmar before and after the 28 March 2025 earthquake. The animation below shows a 5-day apart sequence of images captured by Sentinel-2B and Sentinel-2C (10 m resolution) near the epicenter located close to Mandalay. The surface slip due to the earthquake follows the Sagaing Fault, a major fault in […]

Evolution de l’altitude de la ligne de neige au cours des 41 dernières années dans le bassin versant du Vénéon (Oisans)

Pour contribuer à caractériser les conditions hydrométéorologiques lors de la crue torrentielle qui a frappé la Bérarde en juin, j’ai analysé une nouvelle série de cartes d’enneigement qui couvre la période 1984-2024 [1]. Grâce à la profondeur temporelle de cette série, on constate que l’altitude de la ligne de neige dans le bassin versant du […]

Biophysical parameter retrieval from Sentinel-2 images using physics-driven deep learning for PROSAIL inversion

The results presented here are based on published work: Y. Zérah, S. Valero, and J. Inglada. « Physics-constrained deep learning for biophysical parameter retrieval from sentinel-2 images: Inversion of the prosail model« , in Remote Sensing of Environment, doi: 10.1016/j.rse.2024.114309. This work is part of the PhD of Yoël Zérah, supervised by Jordi Inglada and Silvia Valero. […]

Rechercher