SPOT5 (TAKE5) data production schedule

The processing of SPOT5 (Take5) data is based on a prototype ground segment and involves prototype processors, and we have lots of configuration data to produce for each of the 150 sites. Moreover,  to reduce exploitation costs, the processing at Airbus DS for Level 1A, and then at CNES (L1C and L2A) are launched only once a week. And finally the production of level 2A  based on multi-temporal algorithms requires an initialization with one month of data. We also need to set the new distribution server up. That’s why we need two months after the first acquisitions to start distributing the data, which means that the data should be released before end of June (with some margins). After this initialization period, we should be able to deliver the data on the website 3 weeks after their acquisition. Given the amount of work needed to do that, delays are possible.  

Plus d'actualités

BIOMASS, the third launched satellite mission designed at CESBIO !

After SMOS in 2009, and VENµS in 2017, the CESBIO Laboratory is very proud to see its third proposed mission, Biomass, reach orbit. As always, it has been a long journey from the idea, at the beginning of the century, to the selection in 2013 as the seventh Earth Explorer Mission by ESA, to the […]

Biophysical parameter retrieval from Sentinel-2 images using physics-driven deep learning for PROSAIL inversion

The results presented here are based on published work: Y. Zérah, S. Valero, and J. Inglada. « Physics-constrained deep learning for biophysical parameter retrieval from sentinel-2 images: Inversion of the prosail model« , in Remote Sensing of Environment, doi: 10.1016/j.rse.2024.114309. This work is part of the PhD of Yoël Zérah, supervised by Jordi Inglada and Silvia Valero. […]

Copernicus should keep S2A operational after S2C launch

The launch of Sentinel-2C (S2C) is scheduled on the 4th of September 2024, next week ! After 3 months of commissioning phase, S2C will replace S2A, to fulfill the Sentinel-2 mission together with S2B. S2B will later be replaced by S2D. The current plans are to keep S2A as a redundant satellite, in case something […]

Rechercher